Rand Water Board Building

Business in Johannesburg, South Africa
26°12′11″S 28°2′6″E / 26.20306°S 28.03500°E / -26.20306; 28.03500Technical detailsFloor count3 (basement: 1)Design and constructionArchitect(s)Gordon Leith & Partners

The Rand Water Board was established in 1903, tasked with supplying the water needed to support mining activities and sanitary living conditions for those living in the developing urban area of Johannesburg.

The Rand Water Board Building extension to the Fraser Street offices was the third in a series of buildings owned and occupied by the Rand Water Board (RWB) of Johannesburg before the relocation to large purpose built modern premises in Rietvlei.

For clarity, this entry details the history and development of each successive building in chronological order. The original Rand Water Board Building of 1925 has been demolished.

Building 1: The original Rand Water Board Building, Commissioner Street

Since its establishment in 1903, Rand Water Board had always made use of rented accommodation. The first meetings of the board were in fact held at the Rand Hotel.[1] Once the board gave its approval for the undertaking two business stands, numbers 23 and 24, were purchased in Commissioner Street (‘Marshall’s Township’) for £9250.[2]

The Rand Water Board Building was a Neo-Classical building on Commissioner Street designed by the firm of Gordon Leith & Partners in 1925 and built by Messrs Harper Bros. The consulting architect of the project was G.E.G. Leith (1886-1965), a South African-born, but British-trained architect who had worked under Herbert Baker when the Union Buildings were designed at the turn of the century.[3] The new building's design was in the Beaux Arts tradition and it reminded one of the station building in Pretoria – also a Herbert Baker design.[4]

In 1926, the ~8150sqft building was altered by the architects to enhance the facilities for the Rand Water Board. However, by the mid-1930s, it was clear the Board had insufficient office space in the building. It was proposed, at the time, to add an additional floor to the existing building but this idea was soon dismissed in favour of purchasing a suitable site elsewhere in the city for the erection of a new building that would meet the RWB's current and future office accommodation requirements. The organization, in the interim, had to rent additional office space.[5]

New Consolidated Gold Fields Ltd submitted an offer of £75,000 for the original RWB Building in 1939, which was accepted by RWB. This injection of capital allowed the RWB to commence their plans for a new four storey office building on Fraser Street.

Building 2: The Rand Water Board Building, 3 Fraser Street

The chosen site on Fraser Street was at stands 222 and 227, which were formerly the Primrose Buildings. Following negotiations with the owners, RWB successfully bought and demolished the Primrose Buildings to make way for the new offices in 1939 and building work commenced in 1940. The building work was tendered and the winning tender was that of John Barrow (Pty) Ltd for the sum of £103, 328 0s 0d.[6]

The construction was delayed by war-time restrictions on shipping of materials and took two years to complete, and cost £166,785 5s 10d – around £26,000 more than originally estimated.[7] This new building had 20,200sqft, more than double the size of the original Rand Water Building.

Despite this significant increase in office capacity, by 1962 the RWB were again facing office shortages and overcrowding. Again, the Board considered adding additional floors but it was decided this would not fulfill longer-term space requirements. It was consequently decided to investigate the possibility of extending the existing building by purchasing an adjoining site on which a building, linked to the existing building, could be constructed.[8] The RWB bought the New Library Hotel site from The Johannesburg Balmoral Hotel (Pty) Ltd for R195,000.

Building 3: Extension to the Fraser Street Rand Water Board Building – Custom House

The new extension building was erected on stand 4508 in high quality materials – including black granite, marble, hardwood windows, bronze grilles, brown brick – and had its own vehicular access to the basement. The facade of seven bays with a rusticated base, was articulated by decorative key stones to the ground floor. The architects employed specially moulded bricks and deep stone surrounds to add shadow lines and visual interest to the facade. The building has six storeys (including the ground floor) and a basement.

In 1956, the store on the third floor was converted to office space by C P Robinson, Chief Engineer RWB.

In 1964, the RWB removed the accommodation (workers dormitory, dining hall and caretaker's flat) on the fourth floor to create more offices. This alteration was undertaken by Fassler and Howie.[9] At the completion of the alterations and additions to the building, the fourth floor consisted of a cafeteria, kitchen stores and dining room for cleaning staff. The offices of the Superintendent, Buyer and Controller were allocated on the fifth floor as well as those of the Trades Accounts Departments.[10]

Due to a growing number of employees and responsibilities there was a lack of office space and a decision was taken in 1965 by the Rand Water Board to extend it.[10]

It was originally a 5-storey building with a single basement. In February 1965 an additional floor to the existing Head Office building was approved. This was done by the architects J. Fassler & W. D. Howie.[11]

In 1978, R J Laburn undertook alterations to the staircase basement and first floor and in 1980, alterations were made to the entrance hall.

Continued lack of space led the board to take another decision in 1983 to construct a pedestrian bridge to link the neighbouring Sanlam Building to the Rand Water Board Building. This was because various heads of its Head Offices were accommodated in the Sanlam Building (stand 4779) at the time.

Later Years – Relocation to Rietvlei

The RWB had undertaken as many extensions and improvements as were practicable to the Fraser Street building and its Extension building, and having exhausted all avenues for further expansion decided to relocate the headquarters.

Consequently, the board agreed that its farm, Rietvlei 101 JR, be used for the purposes of the new head office. It was environmentally suited and considered one of the most scenic spots on the Witwatersrand.[12]

The architects and principle agents for the new Rietvlei project were Stauch Vorster & Partners Inc. They were to be assisted by the quantity-surveying firm of Farrow Laing and Partners. The civil and structural engineers were Ove Arup & Partners while the electrical engineering was to be done by Charles Pein & Partners.[13]

The building was completed in 1989 and RWB staff had started occupying completed parts of the building in 1988.

Recent History - 3 Fraser Street and Custom House Extension

The Rand Water Board moved out of the city to Rietvlei and the building was sold to the state. With the proposal of the Kopanong Precinct for the Gauteng Legislature in 2002, this building was to have been demolished providing underground parking with a park on top. Bitterly opposed by the Heritage organizations the project fell through when the matter went to appeal and the demolition permit was denied.[14] However the building was not occupied and currently lies in a dilapidated state.[15]

Heritage Status of the Rand Water Board Building (3 Fraser Street, 1940)

The Rand Water Board Building is recognized as a national heritage asset of exceptional cultural significance for the following reasons:

  • The Rand Water Board Building was described by the National Monument Council in 1991 as “finely proportioned and well-detailed building of outstanding architectural quality”
  • The Rand Water Board Building is a fine example of the Neo-Classical Modernism architectural style executed in high quality materials
  • The Rand Water Board Building was built by John Barrow (Pty) Ltd (Barrow Construction), a company with a reputation for high quality workmanship
  • The Rand Water Board Building with its alterations and extensions tells the story of the expansion of the RWB
  • The Rand Water Board was an important organization in the development of Johannesburg and this was illustrated by the location of the RWB Head Office within the financial district of the city
  • The Rand Water Board Building forms a strong contextual grouping of fine buildings with the neighbouring Custom House, the Second new Library Hotel (1938), Johannesburg Public Library and the Volkskas Buildings.

References

  1. ^ The substance of ubiquity, Rand Water 1903-2003, Johann W.N. Tempelhoff, Kleio Publishers, Vanderbijlpark, 2003, 127. Citing RW, Rand Water Board minutes, 4th ordinary meeting, 1903.05.01. 11
  2. ^ The substance of ubiquity, Rand Water 1903-2003, Johann W.N. Tempelhoff, Kleio Publishers, Vanderbijlpark, 2003, 128. Citing RWA, Minutes, 1925-6, p. 41: Special meeting, Corner House, Johannesburg, 1925.05.29.
  3. ^ The substance of ubiquity, Rand Water 1903-2003, Johann W.N. Tempelhoff, Kleio Publishers, Vanderbijlpark, 2003, 129. Citing G-M. VAN DER WAAL, Die boukuns van Johannesburg 1886-1940: van mynkamp tot metropolis, 183.
  4. ^ The substance of ubiquity, Rand Water 1903-2003, Johann W.N. Tempelhoff, Kleio Publishers, Vanderbijlpark, 2003, 129. Citing G-M. VAN DER WAAL, Die boukuns van Johannesburg 1886-1940: van mynkamp tot metropolis, 182-3.
  5. ^ Water- Rand Water Board Newsletter, 1975 and Water- Rand Water Board Newsletter, 1976
  6. ^ Minutes of RWB Board Meeting 28 Jan 1944 (RWB).
  7. ^ GPG Precinct Project, Final Heritage Impact Assessment Report, 2004. 53
  8. ^ GPG Precinct Project, Final Heritage Impact Assessment Report, 2004. 54
  9. ^ GPG Precinct Project, Final Heritage Impact Assessment Report, 2004. 57
  10. ^ a b "Background". randwater.co.za. Retrieved 2014-08-24.
  11. ^ "Rand Water Board Building, Johannesburg". artefacts.co.za. Retrieved 2014-08-24.
  12. ^ The substance of ubiquity, Rand Water 1903-2003, Johann W.N. Tempelhoff, Kleio Publishers, Vanderbijlpark, 2003, 390. Citing RWA, Minutes 1985-6, p. 109. 1 035th ordinary meeting, headquarters, Johannesburg, 1985.05.30. Chief engineer’s report no. 7390. L.H. James.
  13. ^ The substance of ubiquity, Rand Water 1903-2003, Johann W.N. Tempelhoff, Kleio Publishers, Vanderbijlpark, 2003, 391. Citing RWA, Minutes 1985-6, p. 109. 1 035th ordinary meeting, headquarters, Johannesburg, 1985.05.30. Chief engineer’s report no. 7390. L.H. James and decision
  14. ^ http://www.joburg.org.za/index.php?option=com_content&task=view&id=472&Itemid=253
  15. ^ "Rand Water Board Shame | The Heritage Portal". heritageportal.co.za. Retrieved 2014-08-24.
  • v
  • t
  • e
Greater Johannesburg
Natural environment
  • Highveld
Geology
  • Kaapvaal Craton
  • Transvaal Supergroup
    • Transvaal Basin
  • Witwatersrand Supergroup
    • Witwatersrand Basin
      • Banket
Topography
  • Witwatersrand
  • Magaliesberg (partially)
  • Vredefort impact structure (partially)
Rivers and
wetlands
  • Blesbokspruit
  • Braamfontein Spruit
  • Crocodile River
  • Hennops River
  • Jukskei River
  • Klip River
  • Wilge River
  • Wonderfonteinspruit
Climate
Cradle of
Humankind
Fossil sites
Biodiversity
Vegetation types
  • Andesite Mountain Bushveld
  • Carletonville Dolomite Grassland
  • Eastern Highveld Grassland
  • Eastern Temperate Freshwater Wetlands
  • Egoli Granite Grassland
  • Gauteng Shale Mountain Bushveld
  • Gold Reef Mountain Bushveld
  • Highveld Alluvial Vegetation
  • Moot Plains Bushveld
  • Rand Highveld Grassland
  • Soweto Highveld Grassland
  • Tsakane Clay Grassland
  • Urban woodland
Parks and gardens
Nature reserves
Human impact
Communities
Inner City
Northern
suburbs and
environs
Southern
suburbs and
environs
East Rand
West Rand
Cityscape
Landmarks
Public art
Statues
Civic
buildings
Office
buildings
Skyscrapers
Residential
buildings
Skyscrapers
Structures
Urban planning
Government
National government
Courts
Chapter nine institutions
Provincial government
Municipalities
African Union
Politics
Governing parties
Political organisations
and parties based in
Greater Johannesburg
Political parties
Trade unions
Other political
organisations
Fortifications
Monuments
and memorials
Cemeteries
Historical
sites
Houses
Historical
companies and
organisations
Companies
Political
organisations
Other organisations
Events
Cultural heritage
Performance art
Musical ensembles
Theatres
Events and festivals
Museums and art
galleries
Defunct
Clubs and societies
Religion
Places of
worship
Churches
Anglican
Baptist
Calvinist
Catholic
Maronite
Greek
Orthodox
Latter-day
Saints
Lutheran
  • Friedenskirche
Synagogues
Orthodox
Historical
Progressive
Mosques
Hindu temples
Scientology centres
Media
Mass media
Magazines
Defunct
Newspapers
Defunct
  • New Age
  • The New Age
  • The World
Radio stations
Television channels
Defunct
Film studios
Defunct
Record labels
Game studios
Cultural references
Companies
  • v
  • t
  • e
Companies based in Greater Johannesburg
Diversified
conglomerates
Airlines
Defunct
Construction
and engineering
Energy
Financial
Banks
Hospitality
ICT
Legal
Manufacturing
Media
Mining
Retail and
marketing
Restaurant
franchises
Services
Transport
State-owned
enterprises
  • Companies based in Ekurhuleni
  • Companies based in Johannesburg
Professional
associations
Mining
Mines
Shopping centres
Hotels and resorts
Venues
Restaurants,
bars and cafés
Tourism
Cultural villages
Civil aviation
Airports
Defunct
Road transport
Rail transport
Train stations
Sports governing
bodies based in
Greater Johannesburg
Teams
Soccer
Former
Rugby
Cricket
Basketball
Equestrian sports
Sports events
Sports venues
Stadia and
arenas
Defunct
Golf courses
Equestrian
venues
Motorsports
venues
Defunct
Libraries
Universities
University of Johannesburg
Campuses
Faculties
University of the Witwatersrand
Faculties
Other tertiary
institutions
Business schools
Religious institutions
State schools
Private schools
Alternative schools
International schools
Services
Hospitals
Historical
Water supply
and sanitation
Dams
Water towers
Electricity supply
Defunct power stations
Law enforcement and
emergency services
Charities and NGOs
Military units and formations
Army units
Regular
Reserve
SAMHS units
Disbanded units
Army
Commandos
Special Forces
SAAF
  • Category
  • Johannesburg