Library tram stop

West Midlands Metro tram stop

52°29′N 1°55′W / 52.48°N 1.91°W / 52.48; -1.91Line(s)Line 1 (Edgbaston Village – Wolverhampton St George's/Wolverhampton Station)Platforms2HistoryOpened11 December 2019

Library tram stop is a tram stop on Line 1 of the West Midlands Metro located in Birmingham outside the Library of Birmingham. It opened on 11 December 2019 as the line's terminus when it was extended from Grand Central.[1][2][3] In July 2022 the line was extended to Edgbaston Village.[4][5][6]

Preceding station   Midland Metro   Following station
Town Hall   Line 1   Brindleyplace

References

  1. ^ Birmingham city centre tram extension opens to passengers ahead of schedule Midland Metro Alliance
  2. ^ Catenary-free tram extension inaugurated in Birmingham Metro Report International 11 December 2019
  3. ^ Centenary Square Extension Opens Modern Railways issue 856 January 2020 page 21
  4. ^ New West Midlands Metro trams route from Library to Edgbaston set to begin this weekend Birmingham Mail 15 July 2022
  5. ^ Metro extension to Edgbaston to open this Sunday Express & Star 15 July 2022
  6. ^ West Midlands Metro extension to Edgbaston opens this Sunday West Midlands Metro 16 July 2022

External links

Media related to Library tram stop at Wikimedia Commons

  • v
  • t
  • e
West Midlands Metro West Midlands Metro
Operations
Operators
Vehicles
Urbos 3 tram
Stops
Line One
Planned extensions
Westside extension
Wolverhampton Loop
Proposed extensions
East Birmingham extension
Brierley Hill Line extension