LRTA 1200 class

3rd-generation rolling stock operating at LRT-1
You can help expand this article with text translated from the corresponding article in Japanese. (May 2020) Click [show] for important translation instructions.
  • Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
  • Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
  • You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Japanese Wikipedia article at [[:ja:マニラ・ライトレール1200形電車]]; see its history for attribution.
  • You may also add the template {{Translated|ja|マニラ・ライトレール1200形電車}} to the talk page.
  • For more guidance, see Wikipedia:Translation.

4 ft 8+12 in) standard gaugeNotes/references[1][2][3][4][5][6][7][8][9]

The LRTA 1200 class is the third-generation class of high-floor light rail vehicles (LRV) of the Light Rail Transit Authority servicing the Manila LRT Line 1. Purchased as part of the second phase of the capacity expansion of the line, the trains entered service in December 2006.[9]

Operational history

Package A of the LRT Line 1 Capacity Expansion Project Phase 2 included the procurement of 48 light rail vehicles (LRV), configurable to 12 four-car sets. In 2005, the joint venture of Sumitomo Corporation and Itochu received the order of 48 LRVs and signed a construction contract with Kinki Sharyo and Nippon Sharyo to manufacture and supply the vehicles.[4][10] The capacity expansion project was funded by Japan's official development assistance.[11]

The 3rd-generation trains were inaugurated by former Japanese Prime Minister Shinzo Abe and former President Gloria Macapagal Arroyo on December 9, 2006.[9] The trains raised the line's capacity from 27,000 passengers per hour per direction to 40,000 passengers per hour per direction.[12]

On February 25, 2010, a 1200 class train was used in a test run of the LRT Line 1 North Extension and the MRT Line 3 as part of the MRT-LRT Closing the Loop project that intends to integrate the LRT Line 1 and MRT Line 3 operations, but the integration of operations has not been pursued.[13]

Out of the 12 sets, only 11 sets remain operational, with three light rail vehicles inoperable after a collision as of 2013.[14]

In September 2018, a 3G trainset was decorated with a special "Gabay Guro" decoration to celebrate the National Teachers' Month in the Philippines. The decoration has a library-themed look with images of books. The special themed train was launched on September 6, 2018 and ended a year later.[15]

Design

The LRV design is a 6-axle rigid body consisting of two articulated cars.

Car body

The car body has a length of 26 meters (85 feet 4 inches) without couplers, a width of 2.59 meters (8 feet 6 inches), and a height of 3.91 meters (12 feet 10 inches).[16] 1200 class LRVs have 4 electronic sliding doors on both sides.[4] The train car body is made of beadless lightweight stainless steel, with composite materials on the indoor panels and aluminum on the inner bone to reduce weight.[4] 1200 class LRVs have 4 electronic sliding doors on both sides.[4]

Each light rail vehicle has two roof-mounted air-conditioning units that has a cooling capacity of 41,000 kilocalories (170,000 kilojoules). In total, there are eight air-conditioning units in a four-car train set.[16]

During the production of the 1200 class trains, a mock-up model was constructed. In December 2005, officials from the Light Rail Transit Authority and the project consultant of the capacity expansion project, Manila Tren Consortium, inspected the mock-up model at the factory of Kinki Sharyo in Osaka.[17] It was then displayed at the line's depot in Baclaran, Pasay, in March 2006. The length of the mock-up model is 14 meters (45 ft 11 in) long, or just 54% of the 26-meter (85 ft 4 in) vehicle length.[12]

  • A 1200 class train (front cab) at 5th Avenue station in October 2016.
    A 1200 class train (front cab) at 5th Avenue station in October 2016.
  • A 1200 class train at Balintawak station in December 2021.
    A 1200 class train at Balintawak station in December 2021.
  • A 1200 class train with wrap advertising at Vito Cruz in August 2023.
    A 1200 class train with wrap advertising at Vito Cruz in August 2023.

Interior

The interior is color-toned based on light and dark two-color green in the seats to complement the landscape of Manila. Seats are made of fiber reinforced plastic and has an aluminum bracket type cantilever longitudinal seat for reducing weight. Seating and grip sticks are designed to have ergonomic dimensions, aside from equipment arrangement inside the cab.[16] A wheelchair-compatible space is provided beside the gangway of the intermediate car, alongside an equipped fire extinguisher.[17]

  • 1200 class interior
    1200 class interior
  • Wheelchair strap and space, and fire extinguisher
    Wheelchair strap and space, and fire extinguisher

Mechanical

Each LRV has three inside-frame bogies, similar to the 1000 class. Like all LRT Line 1 rolling stock, the wheel diameter is 660 millimeters (25.98 inches). The bogies consist of two motorized bogies at the ends of the LRV and one trailer bogie under the articulation.[4] The primary suspension is a chevron rubber spring, while the secondary suspension is an air suspension, similar to the 1100 class.[18]

Semi-permanent couplers are present in the ends of each light rail vehicle except the driving cab section of the MC car.

  • The inside-frame bogie of a 1200 class LRV.
    The inside-frame bogie of a 1200 class LRV.
  • Semi-permanent couplers of the 1200 class
    Semi-permanent couplers of the 1200 class

Electrical

The traction control system is IGBTVVVF that drives the four main motors of the two carriages. The traction motors are totally enclosed, self ventilated 3-phase AC induction motors with a power output of 105 kilowatts (141 horsepower). The traction equipment is manufactured by Mitsubishi Electric.

The auxiliaries are 440 volt alternating current static inverters and 110 volt direct current batteries.[19]

Brakes

Knorr-Bremse manufactured the brakes of the 1200 class.[5] The resistors are mounted on the roof for backup regenerative brakes.[4] The VVVF controller has an Electronic Command braking device that uses regenerative and electronically controlled pneumatic brakes.[16] Disc brakes are present on the bogies.[19]

Incidents

  • On June 24, 2010, two trains (1G and 3G) collided at Balintawak station.[20] As a result, LRVs 1248 and 1247 sustained damage. There were plans to restore it,[21] but the involved cars remain idle as of 2022.
  • On February 18, 2011, two trains (1G and 3G) collided near Roosevelt Station in Quezon City at the reversing tracks, around a kilometer away to the east. There were no passengers on board when the incident happened.[22] This caused the Roosevelt and Balintawak stations to remain closed for two months until the stations were reopened on April 11, 2011. An investigation was conducted and was shown that one of the drivers was texting when the incident occurred.[23] This however caused LRV 1236, the 3G unit involved in the incident, to be in idle state and has not yet been restored for service.
  • On May 23, 2015, thousands of passengers were stranded after two trains (1G and 3G) collided near the Monumento station. A train driver was hurt after the impact caused his head to slam into the dashboard of the train.[24] The accident, later revealed to be caused by power fluctuation that affected the signalling system, forced passengers to alight from the station until services was restored around 1 pm at the same day.[25]

Build details (original configurations)

Set No. 1 2 3 4 Manufacturer
01 1201 1202 1203 1204 Kinki Sharyo
02 1205 1206 1207 1208 Kinki Sharyo
03 1209 1210 1211 1212 Nippon Sharyo
04 1213 1214 1215 1216 Nippon Sharyo
05 1217 1218 1219 1220 Kinki Sharyo
06 1221 1222 1223 1224 Kinki Sharyo
07 1225 1226 1227 1228 Nippon Sharyo
08 1229 1230 1231 1232 Nippon Sharyo
09 1233 1234 1235 1236 Kinki Sharyo
10 1237 1238 1239 1240 Kinki Sharyo
11 1241 1242 1243 1244 Nippon Sharyo
12 1245 1246 1247 1248 Nippon Sharyo

References

Wikimedia Commons has media related to LRTA Class 1200.
  1. ^ Department of Transportation and Communications; Light Rail Transit Authority (June 4, 2012). MANILA LRT1 EXTENSION, OPERATIONS AND MAINTENANCE PROJECT (PDF). Public-Private Partnership Center (Report). Retrieved April 9, 2018.
  2. ^ "LRTA LRV". Kinki Sharyo. Archived from the original on July 17, 2011. Retrieved April 9, 2018.
  3. ^ Kinki Sharyo 2006.
  4. ^ a b c d e f g Nippon Sharyo 2007.
  5. ^ a b Knorr-Bremse 2011, p. 11.
  6. ^ JICA 2013b, p. B-3.
  7. ^ DOTC & LRTA 2012, p. 61.
  8. ^ JICA 2013a, p. 12-87.
  9. ^ a b c "PGMA, Japan PM inaugurate 3G trains" (Press release). Light Rail Transit Authority. December 7, 2006. Archived from the original on July 8, 2008. Retrieved April 21, 2022.
  10. ^ "ITOCHU Corporation". Japan Overseas Railway System Association. Archived from the original on August 7, 2020. Retrieved November 27, 2021. In the Philippines, we undertook the Manila LRT Line 1 Capacity Expansion 2 as a JV contractor and we supplied rolling stock and railway systems.
  11. ^ Japan International Cooperation Agency (2012). Ex-Post Evaluation of Japanese ODA Loan Project - LRT Line 1 Capacity Expansion Project (II) (PDF) (Report). Retrieved December 11, 2021.
  12. ^ a b "3rd Generation LRV Mock Up on Display" (Press release). Light Rail Transit Authority. March 9, 2006. Archived from the original on April 24, 2006. Retrieved November 27, 2021.
  13. ^ RTVMalacanang (February 25, 2010). MRT-LRT Closing the Loop Ride. YouTube. Event occurs at 1:37. Retrieved June 8, 2021.
  14. ^ JICA 2013a, p. 5-2.
  15. ^ "LOOK: 'Gabay Guro' train offers chance to rediscover joys of reading, learning". ABS-CBN News. September 6, 2018. Retrieved September 5, 2021.
  16. ^ a b c d Kinki Sharyo 2006, p. 2.
  17. ^ a b "Osaka Inspection Tour" (Press release). Light Rail Transit Authority. December 12, 2005. Archived from the original on December 29, 2005. Retrieved February 17, 2022.
  18. ^ JICA 2013b, p. A-26.
  19. ^ a b DOTC & LRTA 2012, p. 60.
  20. ^ JICA 2013a, p. 8-8.
  21. ^ Department of Transportation and Communications (September 14, 2012). "Invitation to Bid - Rehabilitation and Restoration of Light Rail Vehicles (LRVs) Project" (PDF). Archived from the original (PDF) on December 27, 2021. Retrieved January 16, 2022.
  22. ^ Castro, Doland (February 18, 2011). "2 LRT trains collide". ABS-CBN News. ABS-CBN News and Current Affairs. Archived from the original on May 26, 2020. Retrieved May 26, 2021.
  23. ^ Tan, Kimberly Jane (April 11, 2011). "LRT Balintawak, Roosevelt stations resume operations". GMA News. GMA News and Public Affairs. Retrieved December 28, 2021.
  24. ^ Gonzales, Yuji Vincent (May 23, 2015). "2 LRT trains collide due to technical glitch; at least 1 hurt". Philippine Daily Inquirer. Archived from the original on February 4, 2016. Retrieved May 26, 2021.
  25. ^ Palma, Paola (May 23, 2015). "Minor collision disrupts LRT operation Saturday". CNN Philippines. Archived from the original on January 1, 2016. Retrieved May 26, 2021.

Sources

  • Kinki Sharyo (October 2006). New product マニラ1号線向け連接電車 (PDF) (Report) (in Japanese). Archived from the original (PDF) on April 9, 2018.
  • Nippon Sharyo (January 2007). フィリピン・マニラ都市圏軽軌道公社殿向けLRT1号線用車両完成 (Report) (in Japanese). Archived from the original on November 16, 2015.
  • Knorr-Bremse Group (PDF) (Report). September 22, 2011.
  • Japan International Cooperation Agency; Oriental Consultants Co., Ltd.; ALMEC Corporation; Katahira & Engineers International; Tonichi Engineering Consultants, Inc. (July 2013). Study on railway strategy for enhancement of railway network system in Metro Manila of the Republic of the Philippines: Final report, Vol.1-LRT Line 1: Cavite extension project (2013) (PDF) (Report). Archived (PDF) from the original on December 27, 2021. Retrieved December 27, 2021.
  • Japan International Cooperation Agency; Oriental Consultants Co., Ltd.; ALMEC Corporation; Katahira & Engineers International; Tonichi Engineering Consultants, Inc. (July 2013b). "Appendices" (PDF). Study on railway strategy for enhancement of railway network system in Metro Manila of the Republic of the Philippines: Final report, Vol.1 LRT Line 1: Cavite extension project (2013) (Report). Archived (PDF) from the original on December 27, 2021. Retrieved December 27, 2021.
  • Department of Transportation and Communications; Light Rail Transit Authority (September 14, 2012). PROJECT NO. 5B Restoration of Two (2) 3rd Generation LRVs (RE-BID) (PDF) (Report). Archived (PDF) from the original on December 28, 2021. Retrieved December 28, 2021.
  • v
  • t
  • e
Rolling stock of the Philippines
Line 1
Line 2
Metro Rail Transit Systems
Line 3
Line 7
  • 000 class
Mainline locomotives
Switcher locomotives
Coaches
  • Manila–Dagupan coaches (1885–91)
  • Metropolitan (1914)
  • 7 series (1949–78)
  • 7A-100 I (1949)
  • 7A-100 II (1974–78)
  • 7B (1962)7BP (1968)
  • 7C
  • 7E (1974)
  • 7SE
  • PC777/286 (1960)
  • 7A-2000 (1969–78, acq. 1999–2001)
  • NR (1969–78)
  • 14 series (1966–79, acq. 2004, 2011)
  • 203
  • 8300
Diesel multiple units
Electric multiple units
  • Names in Italics are either decommissioned or not yet in service.