Kuala Kubu Bharu railway station

Railway station in Kuala Kubu Bharu, Malaysia
Preceding station Keretapi Tanah Melayu
(Komuter)
Following station
Tanjung Malim
Terminus
Tanjung Malim–Port Klang Line Rasa
towards Port Klang
Preceding station Keretapi Tanah Melayu (ETS) Following station
Tanjung Malim
towards Ipoh
KL Sentral–Ipoh (Silver) Batang Kali

The Kuala Kubu Bharu railway station is a Malaysian train station stationed at the northern side of and named after the town of Kuala Kubu Bharu, Selangor. The station provides both Komuter and ETS services. The station was opened on January 5, 2008. The station replaced the Kuala Kubu Road railway station approximately 2.5 km northwest.

It was the fourth stop in the Rawang-Tanjung Malim shuttle service (formerly known as the Rawang-Kuala Kubu Bharu shuttle service) until direct services to Port Klang were introduced in 2016.

The station, as are all the other stations along the shuttle route (except the Tanjung Malim Komuter station), is situated along two railways with two platforms like most station halts along KTM Komuter lines, but contains facilities normally reserved for medium-to-large stations along three or more lines. In addition to ticketing facilities and basic amenities, the station contains spaces for administrative occupants, as well as a "kiosk" and an additional footbridge (fused with a footbridge exclusively for Komuter users) for pedestrians that simply intend to cross the railway lines. The station also includes low-tech support for disabled passengers. The station exits northeast into a branch road that leads east into the town center of Kuala Kubu Bharu.

The Kuala Kubu Bharu station's two side platforms are designated as Platform 1 (adjoining the main station building at the east, intended for southbound trains) and Platform 2 (at the west, intended for northbound trains).

References

  • "KTM Komuter Services For Rawang - Rasa Sector Launched". Official Keretapi Tanah Melayu website. April 21, 2007. Archived from the original on August 10, 2007. Retrieved 2007-05-03.
  • "KTM Komuter New Route : Rawang - Kuala Kubu Bharu". Official Keretapi Tanah Melayu website. January 5, 2008. Archived from the original on December 23, 2007. Retrieved 2008-01-05.

External links

  • Kuala Kubu Bharu KTM Railway Station
  • v
  • t
  • e
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • B1
Phase 1

Opening 2025
Phase 2
Stations and services in italics are planned or under construction

3°33′11″N 101°38′24″E / 3.553007°N 101.640006°E / 3.553007; 101.640006


Stub icon

This Malaysian railroad station-related article is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e