Chennai International Airport metro station

Chennai Metro's Blue Line terminal metro station

 Inter Corridor Line PlatformsSide platform
Platform-1 → Train Terminates Here (to be extended to Kilambakkam in the future)
Platform-2 → Wimco Nagar Depot and Puratchi Thalaivar Dr. M.G Ramachandran Central MetroTracks2ConstructionStructure typeElevated, Double trackAccessibleYes Disabled accessOther informationStation codeSAPHistoryOpened21 September 2016; 7 years ago (2016-09-21)ElectrifiedSingle-phase 25 kV, 50 Hz AC through overhead catenaryPassengers20199,000/day[1]Rank3 Services
Preceding station Logo of Chennai Metro Chennai Metro Following station
Meenambakkam Blue Line Terminus
Blue Line
(Future Service)
Pallavaram
towards Kilambakkam
Preceding station Chennai Suburban Following station
Meenambakkam South Line
transfer at Tirusulam
Pallavaram
Route map
Legend
Chennai Suburban Railway
West South Line
Wimco Nagar Depot
Wimco Nagar Depot
Wimco Nagar
Tiruvottriyur
Thiruvottriyur Theradi
Kaladipet
Toll Gate
New Washermanpet
Tondiarpet
Sir Theagaraya College
Washermanpet
Mannadi
High Court
M.G.R Central
Green Line
Green Line
Government Estate
LIC
Thousand Lights
AG – DMS
Teynampet
Nandanam
Saidapet
Little Mount
Guindy
Arignar Anna Alandur
Green Line
Green Line
Nanganallur Road
Meenambakkam
Chennai International Airport Chennai International Airport
LocationMap

Chennai International Airport is an elevated southern terminal metro station on the North-South Corridor of the Blue Line of Chennai Metro in Chennai, India. This station serves the Chennai International Airport and the neighbourhoods of Meenambakkam, Tirusulam, Pallavaram, Pammal, Kundrathur and Tambaram. The station is the only elevated airport metro station in India. The other airport metro stations in the country such as those in Delhi, Lucknow, Mumbai and the proposed ones at Bangalore and Hyderabad are underground.[2] The station enables rapid transit connectivity with the airport, making Chennai the second city in India after Delhi to achieve this.[3]

Construction

The foundation for the station was laid on 24 May 2012. While the architectural and structural design of the station will be carried out by AAI in consultation with Creative Group, the interiors of the station will be designed by CMRL. The time frame for constructing the metro station is 14 months and the work has been awarded to URC Construction Company Private Limited, Erode, at a cost of 480 million.[4]

By the end of July 2014, the structural work on the station was completed.[3]

The station

The station building is a five-level terminal with a basement, ground floor, metro ground floor, concourse, and a platform. The station spans 17,300 square meters. To help passengers alight directly from the international and domestic terminals, the concourse of the station will be linked to the glass connector tube that will connect the two terminals. The station will be an RCC shell structure building with self-supported secret fix aluminium roofing.[4][5]

The station is one of the few in the corridor that will have parking facilities.[6]

Station layout

Chennai International Airport track layout
Legend
P2
P1
to Train Terminates Here **
Station with two tracks and two side platforms
** (Further extension to Kilambakkam metro station in the future)
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Southbound
Towards → Train Terminates Here (to be further extended to Kilambakkam in the future)
Platform 2
Northbound
Towards ← Wimco Nagar Depot next station is Meenambakkam
Side platform | Doors will open on the left Disabled access
L2

Traffic

As of December 2019, about 9,000 passengers board trains at the metro station,[1] up from about 6,500 passengers in February 2019,[7] making it the third busiest Metro stations in Chennai, after Thirumangalam and Chennai Central.

See also

  • flagIndia portal

References

  1. ^ a b Sekar, Sunitha (25 December 2019). "After a slow start, Metro sees steady uptick in ridership". The Hindu. Chennai: Kasturi & Sons. p. 4. Retrieved 28 December 2019.
  2. ^ "Once Hyderabad Airport Metro opens, air passengers can check in at Metro station: HMRL MD".
  3. ^ a b Sekar, Sunitha (4 August 2014). "Metro rail station work at Chennai airport completed". The Hindu. Chennai. Retrieved 4 October 2014.
  4. ^ a b Sridhar, Asha (24 May 2012). "Work on airport metro station to begin soon". The Hindu. Chennai. Retrieved 9 November 2012.
  5. ^ Ayyappan, V. (9 March 2012). "AAI and CMRL firmed up to build the airport metro station". The Times of India. Chennai. Archived from the original on 16 February 2013. Retrieved 6 January 2013.
  6. ^ "Single train trip to equal 16 buses, 300 cars and 600 bikes". The Hindu. Chennai. 29 August 2012. Retrieved 25 November 2012.
  7. ^ Sekar, Sunitha (21 February 2019). "Metro users jump to 90,000". The Hindu. Retrieved 1 March 2019.

External links

  • Official Website for Chennai Metro Rail Limited
  • v
  • t
  • e
Organisations
Planning and administration
Air
Rail
Road
Water
Air
Civil
Military
Rail
Major terminus
Suburban Railway
MRTS
Metro
Locomotive sheds
Road
Major terminus
Motorways
Ring roads
Flyovers/
Grade separators
Water
  • Category
  • Commons
  • WikiProject
  • v
  • t
  • e
Blue Line 1
Operational
Extension
During Phase-2
  • Pallavaram
  • Kothandam Nagar
  • Chromepet
  • Mahalakshmi Colony
  • Thiru.Va.Ka. Nagar
  • Tambaram
  • Irumbuliyur
  • Peerkankaranai
  • Perungalathur
  • Vandalur
  • Arignar Anna Zoological Park
  • Kilambakkam
Depot(s)
  • Wimco Nagar Depot
See also
Bold represents terminal station on the respective main or branch line
*Stations in italics are Under Construction